How electronic power supplies affect power quality
LED lighting, computers, variable-frequency drives and other electronic loads can introduce harmonics and other disturbances into electrical installations. The archived article examines the measurement challenges associated with such loads.
Measure before making decisions
The article refers to IEC 61000-4-30 as an important framework for power-quality measurement methods and instrument performance. A meaningful investigation requires a suitable analyser, measurement campaign and interpretation of results.
Equipment and reporting
The original text describes the use of Elnet PQ analysers and ElnetWEB reports for examining electrical quality. The historical certification or product claims should be checked against current manufacturer documentation.
Engineering recommendation
Do not infer the source of an electrical disturbance from a single snapshot. Review harmonic spectra, operating states, wiring, grounding and the installation context.
Why measurement quality is important
Non-linear loads such as switched-mode power supplies and variable-frequency drives can produce harmonic currents. Whether this creates a practical problem depends on network impedance, load composition, operating conditions and the installation's tolerance to disturbances. A diagnosis should therefore start with measured data, not an assumption that every electronic supply is problematic.
IEC 61000-4-30 defines methods for power-quality measurement, including measurement classes; EN 50160 describes characteristics of voltage supplied by public electricity networks. The standards serve different purposes and neither replaces a site-specific diagnosis.
Measurement and reporting
The archive introduced Elnet PQ analysers and ElnetWEB as tools for assessing harmonics and other parameters. A meaningful investigation records instrument class, measurement configuration, monitoring period and the circumstances under which disturbances appear. Use the actual report to decide whether mitigation or further testing is justified.

Five building automation mistakes that cost investors moreRead article ↗
BACnet, Modbus or KNX: which protocol and when?Read article ↗