Advanced solutions for smart and energy-efficient buildings
+386 2 460 22 58·[email protected]
PROJECT REFERENCE

OCV 3 Hydropower Operations Facility

OCV 3 Hydropower Operations Facility
COMPLETED PROJECT

Engineering for the building

OCV 3 Hydropower Operations Facility: documented automation platform Climatix DDC family.

Discuss a similar project
TECHNICAL OVERVIEW

Installed systems and equipment

Management levelDESIGO INSIGHT V4.0
Automation levelClimatix DDC family
Field levelSYMARO, ACVATIX
Manufacturer / equipmentSIEMENS
CountrySLOVENIA
Implementation and technical details

Integrated building services in the OCV 3 facility

The archived case study describes automation at the OCV 3 building operated by Dravske elektrarne Maribor, including technical areas important for power-station operations. The control concept combines energy-generation equipment with room-level functions and supervisory monitoring.

Plant-room control

The described scope includes switching between energy sources, domestic hot-water preparation, heat pumps and heating and cooling distribution. It also covers control of building water-pumping systems.

Room and support functions

The archive lists fan-coil control, floor heating, ventilation, lighting, blinds, brise-soleil and weather-station integration. Specific tasks include telecommunications-room monitoring, air-conditioning integration and concrete-core temperature control.

The historical equipment overview refers to Desigo Insight V4.0 at management level, Siemens Climatix DDC controllers and Symaro/Acvatix field products.

← Back to all references